Details (RL read field instructions carefully):
*****Change -- If Dune Rd is flooded we will not go over the Ponquogue Bridge we will take an alternate route to the Green Door.****Come join me for a ride over the Ponquogue Bridge. We will be making a rest/food stop at the Green Door Market around mile 17. The average pace for the ride will be between 13.1-13.5 mph. No one will be dropped. Please check the ride calendar for any weather, or last minute cancellations which will be posted no later than 7:30AM if necessary. My cell phone# is 631.484.3490