First click on the "ride title" to see a popup short description of the ride. Then click on the "popup ride title" to see a *** FULL DESCRIPTION *** of the ride details.
NOTE:
Under the Ride Level details, the "Type: Road Bike" refers to the ride will be on paved roads (rather then off road trails). Although a Road Bike is suggested for Road Bike Type rides it is not required. Hybrid and mountain bikes can be used on these rides as well provided you are comfortable with the pace outline in the Posted Ride. This ride calendar is for club rides, club meetings, club event posts and shop rides only.
For Other Events in our area and off Long Island check out the "Other Rides & Events calendar" and the "Forums"
To go more quickly back or forward "several" months click the "Year" link here or at the top of page.
(Intrepid Tag Along ride leader, Alley Gonzalez is still on hiatus)
This is the companion ride to the long-running Kreb Shop "A" Ride. We make every effort to keep both ride groups together, but if there is a split, we let the A ride go ahead. We do scheduled wait-ups (and as necessary), in addition to one brief rest stop about halfway through ride. Please bring adequate drinks and nutrition, as the rest stop occurs in a parking lot (no food/drinks/restrooms available).
This week, we are doing the Extended Route beyond The Maples: we will tack on an 8 mile loop after The Maples rest stop, by making the right turn onto Mill, then left on Connecticut, left on Grumman, left on Line Rd, and left again to return towards regular route back. Route available here:
Please park your car in the Bellport Municipal Parking Lot located at Bellport Lane & Bell Street, and then ride bike half a block over to the Kreb Bike Shop parking lot at 10 Bell Street, to sign-in for ride and hear the pre-ride briefing.
Let's give the Bartlets a try again. They offer a bit of a challenge for poor hill climbers like myself, but if we push on through this ride a few times we should get stronger. Although, I must say, it hasn't worked for me yet, but I haven't given up trying. So come on out and suffer with me. The pace will be a B- until we hit the hills then it will be at whatever pace you can do and there will be be wait-ups for me at the end of the hills. We will take a short break at the golf course. Coffee and rolls are available or bring your own snack. Cancelations or changes will be posted by 9 am.
3:00pm- C 22mi DELAYED - Type: Road Bike - Ride Leader: Barbara -
Symbols: A GO, DELAYED or CHANGED (review comments on ride), CANCELED,
SignIn Sheet Status: waiting , turned in, ride sheet incomplete (Note: also click here for full report of incomplete ride sheets).
Thank you for visiting the SBRA Website. PS: best viewed in all browsers, but IE -- sincerely, your Webmaster. Please send comments & questions about the SBRA site to the SBRA-Webmaster.