On Friday, I drove the original route to see if there would be any surprises. There were. One was a flooded road, not a problem, but the Jessup Lane Bridge to Dune Road is apparently under repair and closed. I have created an alternate route to avoid most of the mess, but you should be aware of the following:
1. The "initial" ride will be 35 miles with a possible 5+ mile addition after we return to the ride strart.
2. Since it is very early in the season, the pace of the ride will attempt to accomodate all of those who show up, but it will be no faster than a slow B.
3. The stop will be at the Beach Bakery, but we will initally pass it as we head to Beach Lane and down to Dune Road.
4. The roads, as you can imagine, are at times fine, OK or terrible.
Hope that those who join me will just enjoy being back in the saddle.
We ride as a group. Those who are comfortable can help with the pulls.
Additional changes or cancellation by 7:30 day of ride.
Cell/text: 631 804-0751